Route 21 and 24 PPP project
Financial close · Uruguay
Source: InfraPPPWorld
The project includes the reconstruction and maintenance of Routes 21 (a stretch between Nueva Palmira and Mercedes) and 24 (which crosses the departments of Río Negro and Paysandú, joining routes 2 and 3). Routes 21 and 24 are two key arterial roads for the transport of production to the port of Nueva Palmira. Of particular interest is the construction of the 8.5 km Nueva Palmira bypass and the 12
- Status
- Closed
- Sector
- Road
- Location
- Uruguay
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Route 21 and 24 PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | financial close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the reconstruction and maintenance of Routes 21 (a stretch between Nueva Palmira and Mercedes) and 24 (which crosses the departments of Río Negro and Paysandú, joining routes 2 and 3). Routes 21 and 24 are two key arterial roads for the transport of production to the port of Nueva Palmira. Of particular interest is the construction of the 8.5 km Nueva Palmira bypass and the 121.75 km rehabilitation of a single carriageway to a dual carriageway. Furthermore, maintenance will be carried out in the two full stretches, totaling 179.10 km. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Uruguay |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
