Route 25 Curve Alignment Restoration

Sector: Automotive • Location: Hollister, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Proposed

The California Department of Transportation (Caltrans) proposes to provide a permanent solution to the failure of the cut slopes of the original State Route 25 Curve Realignment Project. The proposed project would provide a permanent solution to the failed 2015 State Route 25 Curve Realignment Project by flattening the cut slopes to 2:1 (horizontal to vertical dimensions) to reduce erosion, promot

Project Information FAQ

Project Information

4 Q
The project “Route 25 Curve Alignment Restoration” is an infrastructure initiative in the Automotive sector, located in Hollister, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The California Department of Transportation (Caltrans) proposes to provide a permanent solution to the failure of the cut slopes of the original State Route 25 Curve Realignment Project. The proposed project would provide a permanent solution to the failed 2015 State Route 25 Curve Realignment Project by flattening the cut slopes to 2:1 (horizontal to vertical dimensions) to reduce erosion, promote revegetation regrowth, and prevent repeated slope failure. The horizontal curves and banking of the roadway will vehicles to travel through the curve more safely. Approximately 72,000 cubic yards of material would need to be excavated. The project would construct two 12-foot lanes with 4-foot outside shoulders. Existing right-of-way is approximately 30 feet from the centerline of the roadway. Because the existing right of way cannot accommodate the proposed flattening of the slopes, additional permanent right-of-way acquisition would be required. It is estimated that 17 blue oak trees and 1 valley oak tree may need to be removed to accommodate the proposed project. Impacts to trees will be offset by replacement planting within the project limits. In total, a minimum of 191 blue oak trees will be planted within the proposed planting areas. A three-year plant establishment period is proposed. The scope of the replacement planting would be entirely within the limits of this project and within existing and proposed state right-of-way.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data