Route 29 Tunnel, Trenton, NJ

Sector: Bridge • Location: United States

Source: Road Traffic Technology

Project
Closed

Looking north, completion of the remedial excavation and backfill at the foot of Lalor Street (December 2000). Looking northwest, placement of the AASHTO precast girders for the Ramp D bridge which will connect with Lalor Street. In September 1998, the NJDOT began construction of the NJ 29 ‘missing link’ between NJ 129 and the Amtrak Bridge in downtown Trenton, New Jersey, USA. The $94 million p

Project Information FAQ

Project Information

3 Q
The project “Route 29 Tunnel, Trenton, NJ” is an infrastructure initiative in the Bridge sector, located in United States. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Looking north, completion of the remedial excavation and backfill at the foot of Lalor Street (December 2000). Looking northwest, placement of the AASHTO precast girders for the Ramp D bridge which will connect with Lalor Street. In September 1998, the NJDOT began construction of the NJ 29 ‘missing link’ between NJ 129 and the Amtrak Bridge in downtown Trenton, New Jersey, USA. The $94 million project involved a tunnel along the Delaware River banks and was completed in March 2002. The 1.4 mile extension connects the two ends of the New Jersey Route 29 interstate freeway. The Route 29 Project was designed to alleviate traffic congestion throughout the City of Trenton. Until the expansion project, commuters going into the city on Route 29 used a local residential street. The improvements to Route 29, the final section of the Trenton Complex that was started in the 1960s, eliminated a bottleneck created by the gap and connected the interstate loop around the city. The New Jersey Department of Transport (NJDOT) formed a Construction Partnering Team, with representatives from community groups, local businesses, environmental organisations, emergency personnel and government agencies, to represent the varied interests of all those impacted by the Route 29 Project. The aim of this team was to keep all the effected parties informed of the latest news regarding the project, as well as deal with environmental and community issues as they arose. In the 1960s project proposal, the NJDOT proposed the existing NJ 29 be extended by 3.2 miles. Until 1998, only 1.8 miles of this project was completed, with a gap of 1.4 miles between the two ends of the freeway. Motorists between the two sections used Lamberton Road, a two-lane residential street that was not officially designated as NJ 29. Construction began in September 1998 and took approximately threeand-a-half years to complete. Originally planned for completion by Spring 2001, the project was delayed due to environmental issues regarding the silt box on the banks of the river situated adjacent to the newly constructed tunnel on the freeway. There were also problems with debris from the construction being found to contaminate the river. THE PROJECT The NJ 29 project included construction of four 12ft-wide lanes (two lanes in each direction), 12ft wide shoulders and a concrete (‘Jersey’) barrier to separate opposing traffic flows. The NJ Route 29 project was included as part of the 1998 ‘TEA-21’ Federal transportation bill. The new section of the freeway is between the Amtrak Bridge and Route 129 in South Trenton. The contractor’s bid for the project was $71 million. The State of New Jersey and the Federal Highway Administration are funding the Route 29 Project. The roadway divides near the waterfront park with a variable width median from the park to the Amtrak bridge. A portion of the new roadway is depressed. A majority of this depressed portion is a cut-and-cover tunnel section. In addition to walkways and bicycle paths, the park on top of the tunnel features an historic / interpretative area that highlights the history of the South Trenton Waterfront. The new four-lane highway also has an attractive boulevard in the centre.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data