logo

Route 3013 (Main Avenue) over Keyser Creek Bridge Project

Sector: Road • Location: Taylor Borough, Pennsylvania, United States

Source: Commonwealth of Pennsylvania

Project
Design

The Route 3013 Section 202 project involves the rehabilitation of the crossing of Route 3013 (Main Avenue) over Keyser Creek in Taylor Borough, Lackawanna County, PA. The rehabilitation includes removal and replacement of misaligned wing walls with reinforced concrete wing walls, cleaning and repointing stone masonry, replacing cracked stones with Class A cement concrete, constructing reinforced c

Project Information FAQ

Project Information

4 Q
The project “Route 3013 (Main Avenue) over Keyser Creek Bridge Project” is an infrastructure initiative in the Road sector, located in Taylor Borough, Pennsylvania, United States. Taiyo aggregates data on it from Commonwealth of Pennsylvania.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Route 3013 Section 202 project involves the rehabilitation of the crossing of Route 3013 (Main Avenue) over Keyser Creek in Taylor Borough, Lackawanna County, PA. The rehabilitation includes removal and replacement of misaligned wing walls with reinforced concrete wing walls, cleaning and repointing stone masonry, replacing cracked stones with Class A cement concrete, constructing reinforced concrete knee walls, a depressed reinforced concrete apron with baffles inside the culvert, cutoff walls at the inlet and outlet, scour protection with rock placement, installation of a galvanized steel plate liner inside the culvert, new weep holes, minor roadway profile adjustments, and guide rail replacement with curb height modifications. Temporary traffic control measures will be used to keep the roadway open during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data