Route 434 Bridge Replacement over Choconut Creek
Sector: Road • Location: Vestal, New York, United States
Source: WNBF News Radio
Bridge replacement on Route 434 in both directions between Main Street and Front Street in Vestal. Two alternate lanes of four lanes are blocked. Westbound traffic is shifted to one eastbound lane, and eastbound traffic is reduced to one lane. Detour for Town Hall Road is Front Street. Work ongoing through October 31, 2026, between 7 a.m. and 4 p.m.
- Status
- Under Construction
- Sector
- Road, Bridge
- Location
- Vestal, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- WNBF News Radio
ConstructChat
Ask ConstructChat about Route 434 Bridge Replacement over Choconut Creek
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge replacement on Route 434 in both directions between Main Street and Front Street in Vestal. Two alternate lanes of four lanes are blocked. Westbound traffic is shifted to one eastbound lane, and eastbound traffic is reduced to one lane. Detour for Town Hall Road is Front Street. Work ongoing through October 31, 2026, between 7 a.m. and 4 p.m. |
Original sector | Built Sector |
Location
Country | United States of America (USA) |
State | New York |
City | Vestal |
Source
Source | WNBF News Radio |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
