Route 46 Water Main Replacement Phase II
Sector: Water Supply and Storage • Location: Parsippany-Troy Hills, New Jersey, United States of America
Source: Dodge USA
In general, the work consists of the installation of approximately 2,000 feet of 12-inch diameter DIP watermain. Includes general excavation, pipe installation, backfill, compaction, and site restoration, as shown on the contract drawings. The work is located on Route 46 in the municipality of Parsippany-Troy Hills, Morris County, NJ near Edwards Road. The water main replacement extends about 1,00
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Parsippany-Troy Hills, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Route 46 Water Main Replacement Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of the installation of approximately 2,000 feet of 12-inch diameter DIP watermain. Includes general excavation, pipe installation, backfill, compaction, and site restoration, as shown on the contract drawings. The work is located on Route 46 in the municipality of Parsippany-Troy Hills, Morris County, NJ near Edwards Road. The water main replacement extends about 1,000 feet in each direction (east and west) from the Route 46/Edwards Road intersection. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Parsippany-Troy Hills |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
