Route 50 Bridge Beam Removal Project
Sector: Road • Location: Clarksburg, West Virginia, United States
Source: WBOY
The West Virginia Division of Highways is conducting a bridge project on U.S. Route 50 in Clarksburg, involving the removal of existing beams from bridge structures. The project requires full overnight closures of Route 50 between Joyce Street and Chestnut Street exits from November 14 to 16, 2025, with lane closures during the day and a designated detour through downtown Clarksburg.
- Status
- Under Construction
- Sector
- Road, Bridge, Government
- Location
- Clarksburg, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- WBOY
ConstructChat
Ask ConstructChat about Route 50 Bridge Beam Removal Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The West Virginia Division of Highways is conducting a bridge project on U.S. Route 50 in Clarksburg, involving the removal of existing beams from bridge structures. The project requires full overnight closures of Route 50 between Joyce Street and Chestnut Street exits from November 14 to 16, 2025, with lane closures during the day and a designated detour through downtown Clarksburg. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Clarksburg |
Source
Source | WBOY |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-11-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
