Route 560 and Route 565 Mill Pave
Sector: Cement • Location: Florenceville, New Brunswick, Canada
Source: Dodge USA
The proposed Work involves the milling and paving of approximately 1.2 kilometres of roadway on Route 560 and approximately 1.4 kilometres of roadway on Route 565. Work also includes replacement of short sections of concrete curb and resetting catch basin/manhole frame and covers. A portion of the roadway shoulders are to be reshaped and surfaced with reclaimed asphalt pavement (RAP).
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed Work involves the milling and paving of approximately 1.2 kilometres of roadway on Route 560 and approximately 1.4 kilometres of roadway on Route 565. Work also includes replacement of short sections of concrete curb and resetting catch basin/manhole frame and covers. A portion of the roadway shoulders are to be reshaped and surfaced with reclaimed asphalt pavement (RAP). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
