logo
ProjectPlanned

Route 675 Bridge Replacement

Sector: Steel • Location: Montpelier Station, Virginia, United States

Source: Virginia Department of Transportation (VDOT)

The project involves replacing the Route 675 (Dolley Madison Road) bridge over the Norfolk Southern Railroad in Orange County. The existing bridge, built in 1948, is deteriorating and has a weight limit of 5 tons. The new bridge will feature steel beams and a timber deck, accommodating all legal loads.

Status
Prospective
Sector
Steel, Rail, Bridge, Road, Metal, Forest Products and Packaging
Location
Montpelier Station, Virginia, United States of America
Updated
22 Jul 2026
Source
Virginia Department of Transportation (VDOT)

ConstructChat

Ask ConstructChat about Route 675 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Route 675 Bridge Replacement” is an infrastructure initiative in the Steel sector, located in Montpelier Station, Virginia, United States. Taiyo aggregates data on it from Virginia Department of Transportation (VDOT).

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves replacing the Route 675 (Dolley Madison Road) bridge over the Norfolk Southern Railroad in Orange County. The existing bridge, built in 1948, is deteriorating and has a weight limit of 5 tons. The new bridge will feature steel beams and a timber deck, accommodating all legal loads.

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Montpelier Station

Source

Source

Virginia Department of Transportation (VDOT)

URL

More Details

Record type

Project

Sector

Steel, Rail, Bridge, Road, Metal, Forest Products and Packaging

Article published date

2025-04-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project