logo

Route 7 Wittpenn Bridge Project

Sector: Bridge • Location: New Jersey, United States of America

Source: New Jersey Department of Transportation (NJDOT)

Project
Prospective

The Route 7 Wittpenn Bridge project is located within Jersey City (east side of the Hackensack River) and Kearny (west side of the river) in Hudson County. The Wittpenn Bridge carries Route 7 traffic over the Hackensack River and serves as a major connector between Routes 139 and 1&9 Truck (1&9T) to the east, and the New Jersey Turnpike Interchange 15W and Newark/Jersey City Turnpike to the west.

Project Information FAQ

Project Information

4 Q
The project “Route 7 Wittpenn Bridge Project” is an infrastructure initiative in the Bridge sector, located in New Jersey, United States of America. Taiyo aggregates data on it from New Jersey Department of Transportation (NJDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Route 7 Wittpenn Bridge project is located within Jersey City (east side of the Hackensack River) and Kearny (west side of the river) in Hudson County. The Wittpenn Bridge carries Route 7 traffic over the Hackensack River and serves as a major connector between Routes 139 and 1&9 Truck (1&9T) to the east, and the New Jersey Turnpike Interchange 15W and Newark/Jersey City Turnpike to the west. The Route 7 Wittpenn Bridge over the Hackensack River photo The Route 7 Wittpenn Bridge over the Hackensack River Route 7 is a key component of the New Jersey Department of Transportation's (NJDOT) Portway Corridor, allowing traffic from the west to gain access to the Holland Tunnel and New York City, as well as business and industrial areas within Jersey City. Route 7 also serves as a main trucking route that provides for the movement of people and goods between the New York Metropolitan area and the greater area of Kearny and the Meadowlands. The improvements within this project will strengthen access to and between the Newark-Elizabeth Air/Seaport Complex, intermodal rail facilities, trucking and warehousing/transfer facilities, and the regional surface transportation system. These facilities and their access routes are the front door to global and domestic commerce for New Jersey and the greater metropolitan New York region. The project consists of the replacement of the Route 7 Wittpenn Bridge over the Hackensack River and the realignment of Fish House Road on the west side of the river. The new bridge will be located north of the existing bridge. The existing Wittpenn Bridge is a vertical lift bridge that was built in 1930 (pdf 4.1m) and it is 2,169 feet long with 14 deck-girder spans and three through-truss approach spans, two tower spans and a 209-foot vertical lift main span. The bridge currently provides four 10 foot travel lanes (two eastbound and westbound) with no shoulders. There is no physical separation between opposing traffic on the bridge. The new vertical lift structure will carry two 12 foot through lanes, a 12 foot auxiliary lane and a 8 to 10 foot right shoulder in each direction as well as a six foot sidewalk along the eastbound roadway. An eight foot median consisting of variable width inside shoulders and a median barrier will separate opposing traffic flows. The new structure will accommodate pedestrian and bicycle traffic. Also, the new vertical lift bridge will provide for a minimum vertical clearance of 70-feet above Mean High Water (MHW) EL 2.19, in the closed position as compared to 35-feet for the existing lift bridge. A rendering of the new Route 7 Wittpenn Bridge. A rendering of the new Route 7 Wittpenn Bridge. The replacement of the existing bridge has been designed to address the major needs and goals of the project: Replace the structurally deficient bridge. Meet current design criteria and improve traffic operation and safety. Improve traffic service for the region. Increase vertical clearance over the Hackensack River in the closed position to reduce vehicular and marine traffic conflicts. Reduce maintenance costs and traffic disruptions. NJDOT

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data