Route 70 and Route 9 Pavement Preservation Project
Sector: Road • Location: Multiple towns including Manchester, Lakehurst, Toms River, Lakewood, Brick, Point Pleasant, Brielle, Wall, Lacey, Berkeley, Pine Beach, Beachwood, New Jersey, United States
Source: Patch
The project involves pavement preservation on 13 miles of Route 70 and 8 miles of Route 9 in multiple towns in Ocean and Monmouth counties, New Jersey. The work includes applying a sealant to improve the pavement surface, extending the road's useful life, and providing a smoother and safer drive. The project includes phases such as construction sign installation, removal of existing line striping
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves pavement preservation on 13 miles of Route 70 and 8 miles of Route 9 in multiple towns in Ocean and Monmouth counties, New Jersey. The work includes applying a sealant to improve the pavement surface, extending the road's useful life, and providing a smoother and safer drive. The project includes phases such as construction sign installation, removal of existing line striping and raised pavement markings, and application of the pavement preservation sealant. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Morphotek’s New Biologics Production Facility
- LabCentral 238, Cambridge, Massachusetts, USA
- Kite Pharma’s Viral Vector Manufacturing Facility, California, US
- Eli Lilly’s Parenteral Product and Device Manufacturing Facility, Concord, North Carolina
- Amgen’s Drug Substance Manufacturing Plant, Wake County, North Carolina
- Vertex Pharmaceuticals’ Boston Campus
- Roche Diagnostics PCR Diagnostic Kits
