ROUTE 9D BREAKNECK TUNNEL IMPROVEMENTS: LIGHTING, PED, STRUCTURAL
One of 10,000+ projects Taiyo tracks in New York.
Source: New York State Department of Transportation (NYSDOT)
This project will replace the existing lighting system in the Route 9D Breakneck Tunnel in the Town of Philipstown in Putnam County and the Town of Fishkill in Dutchess County. The project will also include resurfacing of the travel lanes and shoulders through the tunnel, concrete tunnel lining, and pedestrian improvements as well as shoulder reconstruction and widening. Coordination will be neces
- Status
- Under Construction
- Sector
- Cement, Tunnel, Automotive, Road, Waste Processing and Treatment, Government
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- New York State Department of Transportation (NYSDOT)
ConstructChat
Ask ConstructChat about ROUTE 9D BREAKNECK TUNNEL IMPROVEMENTS: LIGHTING, PED, STRUCTURAL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will replace the existing lighting system in the Route 9D Breakneck Tunnel in the Town of Philipstown in Putnam County and the Town of Fishkill in Dutchess County. The project will also include resurfacing of the travel lanes and shoulders through the tunnel, concrete tunnel lining, and pedestrian improvements as well as shoulder reconstruction and widening. Coordination will be necessary with Central Hudson Gas & Electric to mitigate a transmission line within the existing drainage system. |
Budget |
Location
Country | United States of America (USA) |
State | New York |
Source
Source | New York State Department of Transportation (NYSDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Tunnel, Automotive, Road, Waste Processing and Treatment, Government |
Article published date | 2026-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
