Routes RN-2 and RN-7 expansion PPP Project
Sector: Bridge • Location: Paraguay
Source: InfraPPPWorld
The expansion and improvement of Paraguay's routes RN-2 and RN-7 is the first roadway project under the Public-Private Alliance (APP) Law of Paraguay, approved in 2013.The project includes 149.5 km of the National Routes RN-2 “Marshal José Félix Estigarribia” and RN-7 “José Gaspar Rodríguez de Francia” that will be duplicated, improved, operated and maintained by the concessionaire.Route 2 links A
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | project in operation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The expansion and improvement of Paraguay's routes RN-2 and RN-7 is the first roadway project under the Public-Private Alliance (APP) Law of Paraguay, approved in 2013.The project includes 149.5 km of the National Routes RN-2 “Marshal José Félix Estigarribia” and RN-7 “José Gaspar Rodríguez de Francia” that will be duplicated, improved, operated and maintained by the concessionaire.Route 2 links Asuncion and Coronel Oviedo while route 7 links Coronel Oviedo and Ciudad Este. The contract encompasses roadways that will be widened, improved, operated, and maintained by the concessionaire.Highlights of the main actions that will be carried out include the following:Upgrading work: improvements from km 13 to km 34 and from km 39 to km 40.5: a total length of 22.5 km.Widening and expansion works: Km 34 (start of the Ypacaraí by-pass) to km 183 (start of the Tape Porá section): a total length of 149 km.Maintenance and operation: Km 33 (start of the Ypacaraí by-pass) to km 183 (start of the Tape Porá section): a total length of 149 Km.By-passes included in the project: Ypacaraí, Caacupé, Itacurubí de la Cordillera, San José de los Arroyos, and Coronel Oviedo.Viaducts and traffic circles:1 traffic circle with a two-level interchange in Coronel Oviedo2 viaducts in Caaguazú.1 "trumpet" type interchange in Caaguazú |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
