Row Improvements- District B REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
DPW713 - ROW Improvements- District B. Services required as part of this contract shall include but not be limited to: 1. Taking elevation shots before, during, and after work has been performed 2. Removal and replacement of sidewalk, driveways, and bus pads. 3. Removal and replacement of non compliant ADA curb ramps. 4. PCC Pavement patching by replacing panels that have failed along with inciden
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- New Orleans, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Row Improvements- District B REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DPW713 - ROW Improvements- District B. Services required as part of this contract shall include but not be limited to: 1. Taking elevation shots before, during, and after work has been performed 2. Removal and replacement of sidewalk, driveways, and bus pads. 3. Removal and replacement of non compliant ADA curb ramps. 4. PCC Pavement patching by replacing panels that have failed along with incidental curb repairs. 5. PCC Pavement joint repairs 6. Patch, mill, and overlay of asphaltic roadways... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | New Orleans |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
