The plant treats water flowing from two locations in the Row River. Built on advanced technology, the upgraded Row River water treatment plant meets the area's increasing demand for drinking water. The Row River Water Treatment Plant is one of the two plants that supply drinking water to Cottage Grove city in Oregon, US. The Row River Water Treatment Plant is one of the two plants that supply drin

Project Information FAQ

Project Information

4 Q
The project “Row River Water Treatment Plant” is an infrastructure initiative in the Hydro sector, located in United States. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The plant treats water flowing from two locations in the Row River. Built on advanced technology, the upgraded Row River water treatment plant meets the area's increasing demand for drinking water. The Row River Water Treatment Plant is one of the two plants that supply drinking water to Cottage Grove city in Oregon, US. The Row River Water Treatment Plant is one of the two plants that supply drinking water to Cottage Grove city in Oregon, US. It is located at the east side of Cottage Grove’s Urban Growth Boundary. The plant treats water flowing from two locations in the Row River. It recently underwent an expansion to extend its supplies to the eastern part of Cottage Grove. The other treatment plant in Cottage Grove, Layng Creek water treatment plant, supplies water to the eastern part of the city. It treats water flowing from the Layng and Prather creeks. The Row River plant is being expanded to replace the Layng plant. The expansion work at Row River plant was finished in February 2009. Work on removal of the decommissioned Layng Creek water line and associated rip rap boulders downstream and northeast of the Row River water treatment plant (RRWTP) is scheduled during the latter part of 2009. Built on advanced technology, the upgraded water treatment plant meets the area’s increasing demand for drinking water. Concerns regarding water quality were addressed by the use of pressurised micro-filtration membranes. Row River capacity expansion The Row River water treatment plant’s capacity was doubled from two million gallons a day (mgd) to 4mgd. With minimal changes, the plant’s capacity can be further expanded to 8mgd. The sand filtration unit which currently treats 2mgd water has been replaced with membrane treatment units that can treat 4mgd. The Row River water treatment plant’s new structure has an air-burst screen-cleaning system and National Marine Fisheries Service-compliant fish screens. The plant will increase the stream flow and improve fish habitat. To this end, a small dam has been removed, and another dam is scheduled to be removed during 2009. As of July 2009, the plant produces approximately 2.4mgd. Water production remains just above the amount of water consumed. Finance The plant’s expansion was funded through low-interest loans obtained as part of the safe drinking water and water / wastewater loan programmes, initiated by the Oregon Economic and Community Development Department. The cost of the expansion is estimated to be $9.5m. Contractors The joint-venture team of Black & Veatch and Slayden Construction Group designed the improvements in such a way that the plant could be constructed and commissioned in less than two years. Black & Veatch completed two other membrane projects in the region. Black & Veatch, founded in 1915, is an American engineering, consulting and construction. Slayden has been involved in projects such as the Scott water treatment plant, Corona del Mar water treatment plant, Sunrise NCCWC water treatment plant and Portland ground water treatment plant. History The Row River water treatment plant was constructed in 1992. Initially, only a single unit was developed to treat 2mgd. However, an option for future expansions was kept open. In 2008, a new pipeline was connected from Cottage Grove’s distribution system in Currin Connector to Layng Creek treatment plant transmission line. Originally, it was planned to upgrade Layng treatment plant, which was constructed in 1940s. Both the transmission line and the plant were outdated. As the water treated at the plant was not meeting the purity standards of the Safe Drinking Water Act, the city administration was under an obligation to upgrade the plant. However, based on engineering evaluation and customer feedback, it was decided to close the Layng plant and expand the Row River plant. Row River future The Layng plant will be shut down once the new membrane filtration system becomes operational. Construction on the system is currently underway. The transmission line will be disconnected and plugged at the city boundary.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data