Rowland Wastewater Treatment Plant Improvements
Sector: Water Supply and Storage • Location: Rowland, North Carolina, United States of America
Source: Dodge
The Project includes the following Work: The project consists of construction of a new headworks structure that includes a manual and mechanical bar screen along with a new grit removal system. This project will also include the construction of a new influent pump station, including wet well, valve vault, pumps, and piping as well as the replacement of the effluent pumps, installation of new aerat
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Power Generation (CCGT), Waste Processing and Treatment, Commercial
- Location
- Rowland, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rowland Wastewater Treatment Plant Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: The project consists of construction of a new headworks structure that includes a manual and mechanical bar screen along with a new grit removal system. This project will also include the construction of a new influent pump station, including wet well, valve vault, pumps, and piping as well as the replacement of the effluent pumps, installation of new aerators and miscellaneous concrete repairs at the lagoon, electrical and SCADA upgrades, and the remo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Rowland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Power Generation (CCGT), Waste Processing and Treatment, Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
