logo

Rowley Park Basketball Rehabilitation

Closed · California · Last reported Mar 2024

Source: Dodge USA

Project
Closed

The proposed hardcourt play area rehabilitation project is designed to provide a new all-weather surface over existing concrete surfacing and reconfigure the existing basketball court(s) to include two new portable pickleball courts. Additionally, the existing lighting will be upgraded to high efficiency LED fixtures with new, relocated or upgraded poles/fixtures. Drainage design includes new catc

Status
Closed
Sector
Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
Location
Gardena, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Rowley Park Basketball Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rowley Park Basketball Rehabilitation” is an infrastructure initiative in the Water Supply and Storage sector, located in Gardena, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed hardcourt play area rehabilitation project is designed to provide a new all-weather surface over existing concrete surfacing and reconfigure the existing basketball court(s) to include two new portable pickleball courts. Additionally, the existing lighting will be upgraded to high efficiency LED fixtures with new, relocated or upgraded poles/fixtures. Drainage design includes new catch basins and drywell stormwater storage and percolation retention areas within the existing tot l...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Gardena

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project