logo

Royalty Centre Electrical Service Upgrade

Sector: Government • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

The provincially owned Royalty Centre is a two storey, 155,000 sq.ft. facility built in 1962, that still operates with the original electrical substation. The work of this project will be to install a new 347/600Volt, 600Amp, 3 Phase switchboard, a 347/600Volt panel board, two 150KVA 600V-120/208Volt dry type transformers and two 120/208Volt, 3 Phase panel boards. Improved efficiency will be accom

Project Information FAQ

Project Information

5 Q
The project “Royalty Centre Electrical Service Upgrade” is an infrastructure initiative in the Government sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The provincially owned Royalty Centre is a two storey, 155,000 sq.ft. facility built in 1962, that still operates with the original electrical substation. The work of this project will be to install a new 347/600Volt, 600Amp, 3 Phase switchboard, a 347/600Volt panel board, two 150KVA 600V-120/208Volt dry type transformers and two 120/208Volt, 3 Phase panel boards. Improved efficiency will be accomplished in the replacement of the 4160Volt to 120/208Volt transformer with the two new dry type transformers. A failure of the system could result in an extended period of time without a source of power and under this situation would be substantially higher cost to repair. Any of these failures would significantly affect government operations.This project will address operational issues that have been further stressed during the ongoing pandemic and support economic recovery through investment in the community by stimulating construction in central Prince Edward Island.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data