logo
ProjectCompleted

Royalty Centre Electrical Service Upgrade

One of 4,618 projects Taiyo tracks in Prince Edward Island.

Source: Infrastructure Canada

The provincially owned Royalty Centre is a two storey, 155,000 sq.ft. facility built in 1962, that still operates with the original electrical substation. The work of this project will be to install a new 347/600Volt, 600Amp, 3 Phase switchboard, a 347/600Volt panel board, two 150KVA 600V-120/208Volt dry type transformers and two 120/208Volt, 3 Phase panel boards. Improved efficiency will be accom

Status
Closed
Sector
Government, Power Generation (CCGT)
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Royalty Centre Electrical Service Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Royalty Centre Electrical Service Upgrade” is an infrastructure initiative in the Government sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The provincially owned Royalty Centre is a two storey, 155,000 sq.ft. facility built in 1962, that still operates with the original electrical substation. The work of this project will be to install a new 347/600Volt, 600Amp, 3 Phase switchboard, a 347/600Volt panel board, two 150KVA 600V-120/208Volt dry type transformers and two 120/208Volt, 3 Phase panel boards. Improved efficiency will be accomplished in the replacement of the 4160Volt to 120/208Volt transformer with the two new dry type transformers. A failure of the system could result in an extended period of time without a source of power and under this situation would be substantially higher cost to repair. Any of these failures would significantly affect government operations.This project will address operational issues that have been further stressed during the ongoing pandemic and support economic recovery through investment in the community by stimulating construction in central Prince Edward Island.

Original sector

Community, Culture and Recreation

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT)

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project