RPower BESS Bond

Sector: Hotel • Location: Poland

Source: International Finance Corporation (IFC)

Project
Active

 R.Power S.A. (“R.Power”, the “Issuer” or the “Company”) is an Independent Power Producer (IPP) focused on utility scale renewable energy projects in Poland (80%+ of its portfolio), Romania and selected EU markets. As of mid-May 2025, it had almost 650 MWp of PV capacity in operations or ready to connect, and around 370 MWp of PV projects under construction. R.Power total grid secured portfolio am

Project Information FAQ

Project Information

4 Q
The project “RPower BESS Bond” is an infrastructure initiative in the Hotel sector, located in Poland. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

 R.Power S.A. (“R.Power”, the “Issuer” or the “Company”) is an Independent Power Producer (IPP) focused on utility scale renewable energy projects in Poland (80%+ of its portfolio), Romania and selected EU markets. As of mid-May 2025, it had almost 650 MWp of PV capacity in operations or ready to connect, and around 370 MWp of PV projects under construction. R.Power total grid secured portfolio amounts to 10 GW, including 7.4 GWp PV projects and 2.6 GW BESS projects. R.Power is headquartered in Warsaw, Poland, with 550+ employees and 12 offices across 7 countries in Europe. The Issuer currently seeks an issuance of EUR 50 million 5-year bonds tranche (the “2025 EUR Tranche”) as part of its 1 billion PLN (EUR 235 million) green bond programme, to fund the construction of three standalone Battery Energy Storage Systems (BESS) projects in Poland, with a combined capacity of 650 MW (the “Project”). The project will allow the dispatch of valuable Renewable Energy (RE) accumulated during peak solar production hours to satisfy the demand at other times of the day. BESS 1 (Jedwabno) will have a capacity of 150 MWp, while BESS 2 (Tursko Wielkie) and BESS 3 (Gdansk II) will each have a capacity of 250 MWp. The total land areas leased for each project range from approximately 1.9 to 4.5 hectares. The land requirement for BESS infrastructure varies from 1.5 to 3.6 hectares. The BESS will need to connect to the National Power System using high-voltage underground cables. The specific location and details of the connection will be determined during the network connection and building permit stages. The routes are estimated to require connection lengths from approximately 9.4 to 11 km. The company will need to obtain land use rights for the transmission lines. At the time of IFC’s appraisal, construction on all three plots has not yet started, and construction of BESS 1 is expected to begin by the end of 2025. Construction activities are expected to be completed within 18-32 months from the start, achieving completion in H1 2027 (BESS 1), H2 2028 (BESS 2) and H1 2029 (BESS3).                                                  

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data