RR082 - Lakeshore Group E
Sector: Car parking • Location: New Orleans, Louisiana, United States of America
Source: Dodge USA
Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
- Status
- Closed
- Sector
- Car parking, Water Supply and Storage, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- New Orleans, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RR082 - Lakeshore Group E
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | New Orleans |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
