RS Energy Efficiency Fund
Sector: Geothermal • Location: Bosnia and Herzegovina
Source: European Bank for Reconstruction and Development (EBRD)
Installation of energy efficiency ("EE") measures in up to 20 publicly-owned buildings (schools and hospitals) in order to achieve reduction of energy consumption and cost savings (the "Project"). The proposed measures include thermal insulation of external walls, thermal insulation of roofs, replacement of windows, installation of high-efficiency lighting and heating and ventilating upgrades incl
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | repaying |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Installation of energy efficiency ("EE") measures in up to 20 publicly-owned buildings (schools and hospitals) in order to achieve reduction of energy consumption and cost savings (the "Project"). The proposed measures include thermal insulation of external walls, thermal insulation of roofs, replacement of windows, installation of high-efficiency lighting and heating and ventilating upgrades including replacement of inefficient and/or coal fired boilers, cooling, ventilation and air conditioning. For each building selected for the Project, an energy manager will be hired and trained to monitor the energy performance of the refurbished buildings. The Project also includes further development of an integrated EE information system and EE database for monitoring energy consumption. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Geothermal projects in Bosnia and Herzegovina
- Gacko 2 Thermal Power Plant, Balkan
- Ugljevik 3 Thermal Power Plant Unit II
- Low Enthalpy Geothermal ENergy Demonstration cases for Energy Efficient building in Adriatic area
- Tuzla Coal Fired Power Plant Unit VII
- Stanari Thermal Power Project, Doboj, Srpska
- Kamengrad Thermal Plant, Sanski Most
- Bugojno Cogeneration Plant I
- Banovici TPP
