logo

RSAB Harapan Kita Construction and Integration of Three Diamond Hospitals Project

Sector: Water Supply and Storage • Location: Indonesia

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The Project encompasses the reconstruction of the Rumah Sakit Anak Bunda Harapan Kita (Mother and Child Hospital) (RSAB Harapan Kita), provision of medical equipment at participating hospitals specifically for mother and child and cardiovascular services, and improvements to the connectivity and integration among RSAB Harapan Kita, Rumah Sakit Jantung dan Pembuluh Darah Harapan Kita (Cardiovascula

Project Information FAQ

Project Information

5 Q
The project “RSAB Harapan Kita Construction and Integration of Three Diamond Hospitals Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project encompasses the reconstruction of the Rumah Sakit Anak Bunda Harapan Kita (Mother and Child Hospital) (RSAB Harapan Kita), provision of medical equipment at participating hospitals specifically for mother and child and cardiovascular services, and improvements to the connectivity and integration among RSAB Harapan Kita, Rumah Sakit Jantung dan Pembuluh Darah Harapan Kita (Cardiovascular Hospital) (RSJPD Harapan Kita), and Rumah Sakit Kanker Dharmais (Dharmais Cancer Hospital) (RS Kanker Dharmais). The Project will increase the total bed capacity of RSAB Harapan Kita from 271 to 550 beds, provide specialized medical equipment, and integrate (physically, digitally and operationally) the three hospitals into an integrated healthcare complex to enhance service coordination and overall patient care. The Project centers on two transformative pillars: (i) digitalization, through the development of robust IT infrastructure to support electronic medical records, AI-enabled tools, and telehealth services; and (ii) green and resilience, by integrating energy-efficient systems, climate-resilient design including seismic response, and sustainable operational practices. Together, these components aim to modernize hospital operations, enhance service delivery, and ensure long-term environmental and system resilience. Key Project Components: Component A: Infrastructure (Civil Works). This component focuses on the reconstruction of the RSAB Harapan Kita building and its supporting infrastructure at the existing site, covering a total construction area of approximately 141,688 square meters. The civil works under supporting infrastructure will also include features on advance waste management system i.e. expansion of the wastewater treatment plant and temporary hazardous waste storage area. Component B: Procurement of Medical and Non-medical equipment and Furniture. This component supports the enhancement of hospital service capacity through the procurement and installation of advanced diagnostic, therapeutic, and support equipment specifically for mother and child and cardiovascular services. Component C: IT system development (including consultancy services). This component aims to enhance hospital IT capacity to support the delivery of more effective and integrated healthcare services. Component D: Human Capital Development. This component focuses on strengthening the institutional capacity of healthcare and non-healthcare personnel to ensure effective operation of the upgraded facilities. Component E: Project Management. This component ensures effective planning, execution, and monitoring of the Project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data