RSAB Harapan Kita Construction and Integration of Three Diamond Hospitals Project
Sector: Hospital • Location: Indonesia
Source: Asian Infrastructure Investment Bank (AIIB)
�The Project encompasses the reconstruction of the Rumah Sakit Anak Bunda Harapan Kita (Mother and Child Hospital) (RSAB Harapan Kita), upgrade of medical equipment at Rumah Sakit Jantung dan Pembuluh Darah Harapan Kita (Cardiovascular Hospital) (RSJPD Harapan Kita) and improvements to the connectivity and integration among RSAB Harapan Kita, RSJPD Harapan Kita, and Rumah Sakit Kanker Dharmais (Ca
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | �The Project encompasses the reconstruction of the Rumah Sakit Anak Bunda Harapan Kita (Mother and Child Hospital) (RSAB Harapan Kita), upgrade of medical equipment at Rumah Sakit Jantung dan Pembuluh Darah Harapan Kita (Cardiovascular Hospital) (RSJPD Harapan Kita) and improvements to the connectivity and integration among RSAB Harapan Kita, RSJPD Harapan Kita, and Rumah Sakit Kanker Dharmais (Cancer Hospital) (RSKD).The Project will increase the total bed capacity of RSAB Harapan Kita from 271 to 550 beds, provide specialized medical equipment and integrate (physically, digitally and operationally) the three hospitals into an integrated healthcare complex to enhance service coordination and overall patient care. A central feature of the Project is the introduction of digital infrastructure, which will support digitalization of hospital operations and enable the adoption of cutting-edge medical technologies, such as telemedicine. The upgraded medical equipment and service integration will allow the hospitals to adapt to shifting demographics and emerging disease patterns, including aging populations, non-communicable diseases (NCDs), and climate-sensitive health conditions as tertiary care and national level referral hospitals. The construction and infrastructure upgrades will follow a green healthcare model incorporating climate mitigation and adaptation measures while prioritizing energy efficiency. Further, the structural design will incorporate measures reducing the risk of future earthquake damages to save lives and ensure their continued operation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
