logo
ProjectActive

RSE CCBPL 2023

Active · Pakistan

Source: IFC Project Disclosures

 Coca-Cola Beverage Pakistan Limited (CCBPL) is the exclusive bottler of ‘The Coca-Cola Company’ (TCCI) in Pakistan with the rights to produce, market, and distribute Coca-Cola's non-alcoholic carbonated, still purified water, fruit juices, and energy beverages. In 2016, IFC committed a €75 million A-Loan to CCBPL (or the Company). The second investment was a loan up to US$40 million to CCB

Status
Prospective
Sector
Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Consumer Products
Location
Pakistan
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about RSE CCBPL 2023

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “RSE CCBPL 2023” is an infrastructure initiative in the Chemical (Industrial) sector, located in Pakistan. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

 Coca-Cola Beverage Pakistan Limited (CCBPL) is the exclusive bottler of ‘The Coca-Cola Company’ (TCCI) in Pakistan with the rights to produce, market, and distribute Coca-Cola's non-alcoholic carbonated, still purified water, fruit juices, and energy beverages. In 2016, IFC committed a €75 million A-Loan to CCBPL (or the Company). The second investment was a loan up to US$40 million to CCBPL committed in 2022 under COVID-19 Real Sector Envelope (RSE) Facility to fund CCBPL's expanded working capital needs, which have arisen due to COVID and partially finance the Company's capital expenditure program, which COVID delayed. This proposed investment (#48308) of up to US$50 million (equivalent in Euro) is the third investment with CCBPL, still under COVID-19 RSE Facility to finance its increased working capital requirements and maintenance capex of around US$8-10 million in FY23 (the Project). CCBPL’s annual production capacity is 358 million-unit cases (UC) (1 unit case = 5,678 liters). CCBPL is an IFC portfolio client with operational footprint encompassing seven manufacturing facilities across Pakistan, including Lahore, Gujranwala, Rahimyar Khan, Multan, Faisalabad, Karachi, in addition to the latest greenfield bottling facility (known as KPGF) located in Haripur (formally known as Islamabad bottling facility). The expansion of the KPGF plant included the addition of one Polyethylene Terephthalate (PET) line having similar production capacity as the existing operational PET line (i.e. 45,000 bottles per hour).  CCBPL’s environmental and social (E&S) performance against IFC’s Performance Standards requirements, including implementation of E&S Action Plan (ESAP) for CCI 2016 investment available at - https://disclosures.ifc.org/project-detail/ESRS/37922/cci-pakistan has been judged satisfactory. As part of the appraisal for #46251, (https://disclosures.ifc.org/project-detail/ESRS/46251) IFC undertook an ESAP implementation update, the outcome of which is the consolidated ESAP attached to this ESRS.

Original sector

F-BA - Soft Drink

Location

Country

Pakistan

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Consumer Products

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project