Réseau électrique métropolitain (REM) – project update
Sector: Airport • Location: Canada
Source: Caisse de dépôt et placement du Québec
CDPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, presented an update today to report on the progress of its Réseau électrique métropolitain (REM) project and on the latest proposed route optimizations. Following technical and environmental consultations and analyses carried out on a continuous basis since the project was announced on April 22, various measures have been taken to
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | CDPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, presented an update today to report on the progress of its Réseau électrique métropolitain (REM) project and on the latest proposed route optimizations. Following technical and environmental consultations and analyses carried out on a continuous basis since the project was announced on April 22, various measures have been taken to optimize the route, in collaboration with different stakeholders, including municipalities and transit authorities. These improvements target all aspects of the project, including service quality and efficiency, the reduction of environmental and social impacts, and the reduction of travel times. The REM is a new 67-km integrated public transportation network that will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a fully automated, electric light rail transit (LRT) system. The environmental impact public hearing (BAPE) requested from the Minister of Sustainable Development, Environment and the Fight against Climate Change begins on Monday, August 29. Detailed information on this hearing is available on the BAPE website. Documents related to the Environmental Impact Study are also available on the CDPQ Infra website: • Media technical briefing • Updated – Technical fact sheets (recent route optimizations) • Summary of the Environmental Impact Study (French version only) • Summary report of the Environmental Impact Study • Environmental Impact Study and its Addenda 1, 2 and 3 To follow the project on Twitter: @CDPQInfra false false false |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
