RSSP CKC Water System Improvements
Sector: Water Supply and Storage • Location: Berkeley, California, United States of America
Source: Dodge
The project consists of extending the Clark Kerr campus fire water system on Eastway Drive to Building 19. Stub-outs for future connections to Buildings 20 and 21 will also be installed. There are two bid alternatives included with this project. The first consists of extending the campus domestic water to Building 19, 20, and 21. The second consists of a driveway widening towards Building 20.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial
- Location
- Berkeley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RSSP CKC Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of extending the Clark Kerr campus fire water system on Eastway Drive to Building 19. Stub-outs for future connections to Buildings 20 and 21 will also be installed. There are two bid alternatives included with this project. The first consists of extending the campus domestic water to Building 19, 20, and 21. The second consists of a driveway widening towards Building 20. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Berkeley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
