logo
ProjectPlanned

Rt. 202 Bridge Replacement over Still Brook in Bantam

Planned · Connecticut · Last reported Jun 2025

Source: i95 ROCK

Temporary closure of Rt. 202 for the replacement of the bridge over Still Brook just East of Merritt Clarke's in Bantam. The closure is scheduled from June 16 to August 31, 2025, with detours directing traffic around the construction area.

Status
Prospective
Sector
Bridge, Road
Location
Litchfield, Connecticut, United States of America
Updated
19 Nov 2026
Source
i95 ROCK

ConstructChat

Ask ConstructChat about Rt. 202 Bridge Replacement over Still Brook in Bantam

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Rt. 202 Bridge Replacement over Still Brook in Bantam” is an infrastructure initiative in the Bridge sector, located in Litchfield, Connecticut, United States. Taiyo aggregates data on it from i95 ROCK.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Temporary closure of Rt. 202 for the replacement of the bridge over Still Brook just East of Merritt Clarke's in Bantam. The closure is scheduled from June 16 to August 31, 2025, with detours directing traffic around the construction area.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Connecticut

City

Litchfield

Source

Source

i95 ROCK

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2025-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project