Rt 522 Public Water Supply System Construction Phase 2
Sector: Water Supply and Storage • Location: Virginia, United States of America
Source: Dodge
Construct Phase 2 of the public water supply system in the vicinity of the closed landfill. This Phase includes water line extensions from Rt 638 down Rt 522 to homes along Stonehouse Mtn Road. It is intended to serve existing homes.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Residential, Road, Waste Processing and Treatment, Commercial
- Location
- Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rt 522 Public Water Supply System Construction Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct Phase 2 of the public water supply system in the vicinity of the closed landfill. This Phase includes water line extensions from Rt 638 down Rt 522 to homes along Stonehouse Mtn Road. It is intended to serve existing homes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Residential, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
