Rubicon Tank No. 1 Water Feed Line Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to construct approximately 250 linear feet of 10-inch water main, valves, fittings, and associated items
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Tahoe City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rubicon Tank No. 1 Water Feed Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to construct approximately 250 linear feet of 10-inch water main, valves, fittings, and associated items |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Tahoe City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
