Rubicon Wells 2 & 3 Backup Power
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work to be performed for this project consists of all labor, material,tools, equipment and incidentals necessary to construct an approximately 440square foot building, backup generator, chlorine injection system, accessdriveway, connections to existing wells, and associated items as shown on theconstruction drawings.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Tahoe City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rubicon Wells 2 & 3 Backup Power
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed for this project consists of all labor, material,tools, equipment and incidentals necessary to construct an approximately 440square foot building, backup generator, chlorine injection system, accessdriveway, connections to existing wells, and associated items as shown on theconstruction drawings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Tahoe City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
