logo

Rudeshur Power Plant

Sector: Natural Gas • Location: Iran, Islamic Rep.

Source: World Bank Group

Project
Active

In July of 2004, financial close was achieved on Iran's first private power plant, with the local Arian Mah’taab Gostar (Aryan Mahtab Goster) Company carrying out the project on a build-own-operate basis. The plant was to be located at Rudeshur, 40 kilometres outside Tehran. Gas was to be sourced from Iran Natural Gas Company and the offtaker was to be state power company Tavanir.

Belgium-ba

Project Information FAQ

Project Information

4 Q
The project “Rudeshur Power Plant” is an infrastructure initiative in the Natural Gas sector, located in Iran, Islamic Rep.. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In July of 2004, financial close was achieved on Iran's first private power plant, with the local Arian Mah’taab Gostar (Aryan Mahtab Goster) Company carrying out the project on a build-own-operate basis. The plant was to be located at Rudeshur, 40 kilometres outside Tehran. Gas was to be sourced from Iran Natural Gas Company and the offtaker was to be state power company Tavanir. Belgium-based Unit International was awarded the engineering, procurement and construction (EPC) contract for the single-cycle plant that was to initially have 750 MW of generating capacity, rising to 1,250 MW and then to 2,000 MW in subseqent phases. Germany's Siemens was been awarded the subcontract to supply three 264-MW turbines and electrical equipment while Unit International subsidiary STFA was to carry out civil and mechanical works. Work began immediately following the financial closure and was scheduled for completion in about 22 months. Financing was arranged by Hypovereinsbank and was structured as a blend of export credits from Germany’s Hermes and Belgium’s Office National du Ducroire, along with commercial debt. About Eur 150 million (US$180 million) was raised at syndication, with four banks coming on board – BNP Paribas, Calyon, Dexair and Fortis Bank. Germany’s Fichtner was the consultant. Government guarantees were signed by the Economy & Finance Ministry. Can't find type of Government Guarantee, no details available. None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data