Rue Marcoux - Bois-Joli
Sector: Waste Processing and Treatment • Location: New Brunswick, Canada
Source: Infrastructure Canada
The project consists of installing water and sewer pipes along 1.1 kilometres of Rue Marcoux including changing the drainage systems under the road. 22 homes will be added to the Town’s sewage system which will eliminate problematic septic fields which threaten to contaminate the water table. The project includes the connection of 22 homes to the municipal water network which will ensure access to
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Government, Road, Residential
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rue Marcoux - Bois-Joli
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of installing water and sewer pipes along 1.1 kilometres of Rue Marcoux including changing the drainage systems under the road. 22 homes will be added to the Town’s sewage system which will eliminate problematic septic fields which threaten to contaminate the water table. The project includes the connection of 22 homes to the municipal water network which will ensure access to potable water for residents and eliminate 22 wells which are a potential risk to the water table. The pipes will be installed up to the limits of the residential properties, however it is incumbent on the land owners to install the connections between the municipal services and the residential infrastructure. No work will be done on private property or on private infrastructure. The project consists of redoing the ditching and the drainage pipes along the road to ensure the best runoff drainage possible. This will mitigate the risk of flooding and erosion due to climate change. This work will provide a better drainage on the road that will protect the structure. In addition to the work already completed, the new scope of work includes the modernization of six lift stations, which will also help reduce the risk of flooding in low-lying areas of the village. It was also recommended that the town continue with server upgrades to become SCADA-compliant, to ensure more effective monitoring, and to create system redundancy. The work will also include the installation of two submersible pumps to combat flooding. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Government, Road, Residential |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
