logo
ProjectPre-Design

Ruiz Park Irrigation Well Replacement

Pre-design · California · Last reported Nov 2024

Source: Dodge USA

The current irrigation well was lowered to the bottom of the well pit in the summer of 2022. If the water table continues to drop the park will be without water and a new water source will need to be found. This project will drill a new irrigation well before the current well goes dry. Park wells are for the purpose of irrigating park turf and landscaping, and benefit only the park portion of the

Status
Prospective
Sector
Water Supply and Storage, Government, Commercial, Car parking, Automotive, Raw Materials
Location
Visalia, California, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Ruiz Park Irrigation Well Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ruiz Park Irrigation Well Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Visalia, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The current irrigation well was lowered to the bottom of the well pit in the summer of 2022. If the water table continues to drop the park will be without water and a new water source will need to be found. This project will drill a new irrigation well before the current well goes dry. Park wells are for the purpose of irrigating park turf and landscaping, and benefit only the park portion of the land. This project is 100% General F

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Visalia

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Car parking, Automotive, Raw Materials

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project