Rumah Guntur House / PSA Studio
One of 10,000+ projects Taiyo tracks in Indonesia.
Source: ArchDaily
The tropical concept is applied differently in this house by tilting the wall facade and limiting the width of the openings to protect from rain and direct sunlight. Brick material dominates, not only as a second skin but literally as a room-dividing material. The concrete columns are hidden between two layers of bricks, front and back. Hollow space between the bricks layer accommodates the need f
- Status
- Closed
- Sector
- Power Generation (CCGT), Residential, Cement, Commercial
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Rumah Guntur House / PSA Studio
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The tropical concept is applied differently in this house by tilting the wall facade and limiting the width of the openings to protect from rain and direct sunlight. Brick material dominates, not only as a second skin but literally as a room-dividing material. The concrete columns are hidden between two layers of bricks, front and back. Hollow space between the bricks layer accommodates the need for electricity pipes.Every room in this house is planned as carefully as possible according to the owner's needs, who wants everything just the right size but accommodating all their needs. The stairs area and kid's room only use boards as room dividers, blending together as furniture elements. Almost every corner of the house is used as storage to keep the house looking tidy.Text description provided by the architects.With a total land area of 300 sqm, the owner only needs half of it for the main activities of the house, while the rest is planned as family recreation areas such as sports, gatherings, and playing. The first floor is elongated to the right side of the land. Initially, the mass of the second floor was positioned the same as the first floor, but we wanted to slightly 'play' on the massing by rotating it 90 degrees so that it is transverse to the site.This arrangement opens up new possibilities, such as creating a large terrace area on the first floor and creating additional space on the second floor as a workspace and a balcony, which complements family recreation facilities in the form of outdoor and semi-indoor. To maintain the family’s privacy, the main gate is made quite high with massive material connected to the carport canopy. |
Location
Country | Indonesia |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Cement, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Indonesia
- Sarulla Geothermal Power Plant
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Muara Karang Expansion Project Jakarta Indonesia
- Cirata Floating Photovoltaic Power Plant
- Tanjung Jati B Power Plant Expansion
- Tolo Wind Park
- Jatiluhur I Drinking Water Supply System
