Runde Park Parking Lot and Path Paving
Sector: Water Supply and Storage • Location: Fort Mill, South Carolina, United States of America
Source: Dodge USA
All bids must be made on the basis of and meet or exceed the requirements contained herein. The successful Offeror must be able to provide services, to include the following: 1. Excavate approximately 25,540 sqft of existing asphalt, grade as necessary and repave 25,549 sqft with asphalt at a 4 depth. 2. Install approximately 106 LF of water 3. break. a. Repaint parking spaces and basketball court
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Automotive, Government, Commercial
- Location
- Fort Mill, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Runde Park Parking Lot and Path Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | All bids must be made on the basis of and meet or exceed the requirements contained herein. The successful Offeror must be able to provide services, to include the following: 1. Excavate approximately 25,540 sqft of existing asphalt, grade as necessary and repave 25,549 sqft with asphalt at a 4 depth. 2. Install approximately 106 LF of water 3. break. a. Repaint parking spaces and basketball court 4. Provide unit pricing for cost per LF of curb installation on backside of sidewalk. 5. Reinsta... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Fort Mill |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
