logo

Runnymede Healthcare Centre

Sector: Commercial • Location: Toronto, Ontario, Canada

Source: P3Spectrum, Canada

Project
Operational

Opportunity Runnymede was experiencing longer wait times as demand for its specialized continuing care services continually increased. Caring for all these patients close to home required expanding and upgrading the facilities. Runnymede Hospital’s main building first served as Strathcona Public School in 1908 and was converted to a chronic care facility in 1945, operating for almost 50 years with

Project Information FAQ

Project Information

5 Q
The project “Runnymede Healthcare Centre” is an infrastructure initiative in the Commercial sector, located in Toronto, Ontario, Canada. Taiyo aggregates data on it from P3Spectrum, Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Opportunity Runnymede was experiencing longer wait times as demand for its specialized continuing care services continually increased. Caring for all these patients close to home required expanding and upgrading the facilities. Runnymede Hospital’s main building first served as Strathcona Public School in 1908 and was converted to a chronic care facility in 1945, operating for almost 50 years with few upgrades. The hospital received approval for an expansion in 1987, but its future remained in limbo and it nearly closed twice over the next 20 years. Work finally began to build the new Runnymede Health Care Centre in 2007, after the Government of Ontario announced it would be redeveloped under the new Alternative Financing and Procurement model (AFP). Challenges Constructing a new four-storey building while continuing to operate in the old one, then ensuring a safe, effective transition of patients and staff. Innovations The guaranteed maximum price contract ensured that Bondfield was responsible for all coordination activities to ensure the facilities were constructed in accordance with the design. These risks that would have been borne by the public sector under traditional procurement. Bondfield was required to finance the project up until substantial completion, removing significant risk from the public sector for late delivery. Results At 180,000 square feet, the new facility is almost four times the size of the original hospital and has more than doubled their capacity from 95 to 200 beds. Enhanced clinical and medical services include physiotherapy and occupational therapy; communication, swallowing and audiology therapy; respiratory therapy; activation and recreation activities; social services; and around the clock professional nursing and medical care. Wait times for clinical and medical services have been significantly reduced. Patients may relax in two open-air courtyards and two therapeutic gardens or dine outdoors on covered terraces. The hospital also provides patients with GPS-equipped bands to alert staff when they leave the ward or wander off their floor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data