Runway 1 Safety Area Improvements
Sector: Water Supply and Storage • Location: Greenville, South Carolina, United States of America
Source: Dodge USA
This Project involves all demolition, grading, drainage, paving, retaining wall and installation of Owner-supplied Engineered Materials Arresting System (EMAS) for Runway 1 threshold. Work includes approximately 45,000 cubic yards of earthwork, construction of permanent dry detention basin, 405 linear feet of variable height mechanically stabilized earth (MSE) retaining wall, storm drainage pipes
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Greenville, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Runway 1 Safety Area Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project involves all demolition, grading, drainage, paving, retaining wall and installation of Owner-supplied Engineered Materials Arresting System (EMAS) for Runway 1 threshold. Work includes approximately 45,000 cubic yards of earthwork, construction of permanent dry detention basin, 405 linear feet of variable height mechanically stabilized earth (MSE) retaining wall, storm drainage pipes and structures, construction of 4,365 square yards of asphalt pavement (including base). Incident... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Greenville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
