Runway 14-32 Reconstruction
Sector: Airport • Location: New Richmond, Wisconsin, United States of America
Source: Dodge
Runway 14-32 is the primary runway used by the airport. The runway was last reconstructed in 2007 and 2008 at which point it had a useful life of 20 to 25 years. The master plan, which is currently underway, will provide options available such as doing a rehab only on the pavement and keeping the current width or needing to widen and reconstruct the runway. The design portion of this project is es
- Status
- Prospective
- Sector
- Airport, Government, Road, Commercial, Manufacturing (Industrial)
- Location
- New Richmond, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Runway 14-32 Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Runway 14-32 is the primary runway used by the airport. The runway was last reconstructed in 2007 and 2008 at which point it had a useful life of 20 to 25 years. The master plan, which is currently underway, will provide options available such as doing a rehab only on the pavement and keeping the current width or needing to widen and reconstruct the runway. The design portion of this project is estimated to begin in 2028 with reconstruction pending for 2032. The City of New Richmond may be se... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | New Richmond |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Airport, Government, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in United States of America
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- AIRPORT ROAD IN VIDALIA - TIA
- ATLANTA-CCO - CRRSA
- DAWSON - CARES ACT
- PROJECT ADMINISTRATION - FAA-3-13-SBGP-04-2009 - FY09 DISCR
- McRAE-ENVIRON. ASSMT. FOR PARALLEL TAXIWAY AREA IMPROVMENT
- REIDSVILLE- FUEL FACILITY CARD READER AND DESIGN OF RUNWAY
