Runway 18-36 Rehabilitation REBID
Bidding · Oklahoma · Last reported Aug 2024
Source: Dodge USA
The proposed project includes the variable depth mill and nominal overlay of the primary runway (Runway 18-36). The project also includes grading improvements within the runway safety area (RSA) grading off the two runway ends. An edge drain-system is proposed along the length of the runway. Minor electrical work includes the replacement of a threshold lighting pad and associated electrical equipm
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Ada, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Runway 18-36 Rehabilitation REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project includes the variable depth mill and nominal overlay of the primary runway (Runway 18-36). The project also includes grading improvements within the runway safety area (RSA) grading off the two runway ends. An edge drain-system is proposed along the length of the runway. Minor electrical work includes the replacement of a threshold lighting pad and associated electrical equipment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Ada |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
