logo
ProjectPre-Design

Runway 30 Construction Phase 2

Pre-design · Arizona · Last reported Sep 2025

Source: Dodge

Runway 30 Construction Phase 2 construction and final grading for an EMAS (Engineered Material Arresting System, 700 LF x 400 LF) to meet C-II ADQ requirements.

Status
Prospective
Sector
Government, Manufacturing (Industrial), Commercial
Location
Marana, Arizona, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Runway 30 Construction Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Runway 30 Construction Phase 2” is an infrastructure initiative in the Government sector, located in Marana, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Runway 30 Construction Phase 2 construction and final grading for an EMAS (Engineered Material Arresting System, 700 LF x 400 LF) to meet C-II ADQ requirements.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Marana

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Commercial

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project