Runway 5-23 Rehabilitation - Groton-New London Airport
Closed · Connecticut · Last reported Sep 2024
Source: Dodge USA
The project consists of: The project consists of rehabilitating the full Runway 5-23, the intersection of Runway 5- 23/Runway 15-33 and stub taxiways (Taxiway C, D, & E) pavements to past the hold position markings, airfield lighting, and airfield signs. The project work will include: pavement milling; underlying surface preparations (i.e. crack repairs); new surface pavement; pavement grooving; a
- Status
- Closed
- Sector
- Water Supply and Storage, Airport, Commercial, Power Generation (CCGT), Road, Aerospace & Defense, Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Groton, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Runway 5-23 Rehabilitation - Groton-New London Airport
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: The project consists of rehabilitating the full Runway 5-23, the intersection of Runway 5- 23/Runway 15-33 and stub taxiways (Taxiway C, D, & E) pavements to past the hold position markings, airfield lighting, and airfield signs. The project work will include: pavement milling; underlying surface preparations (i.e. crack repairs); new surface pavement; pavement grooving; airfield electrical work with new elevated and in-pavement runway and taxiway edge lights, elevate... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Groton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Airport, Commercial, Power Generation (CCGT), Road, Aerospace & Defense, Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
