Runway 5/23 Extension Shift - Runway 5 Obstructions
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
To mitigate obstructions in the navigable airspace off Runway 5 in accordance with 14 CFR Part 77. Contractor shall clear 1.8 acres of trees (obstructions) and grub, grade to drain, seed and mulch areas of disturbance. Contractor shall clean up all work areas.
- Status
- Closed
- Sector
- Airport, Government, Commercial, Raw Materials, Waste Processing and Treatment
- Location
- Shreveport, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Runway 5/23 Extension Shift - Runway 5 Obstructions
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To mitigate obstructions in the navigable airspace off Runway 5 in accordance with 14 CFR Part 77. Contractor shall clear 1.8 acres of trees (obstructions) and grub, grade to drain, seed and mulch areas of disturbance. Contractor shall clean up all work areas. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Shreveport |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Government, Commercial, Raw Materials, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
