Runway 9-27 Pavement Rehabilitation
Sector: Airport • Location: Fort Lauderdale, Florida, United States of America
Source: Dodge USA
The work includes, but is not limited to, milling and resurfacing of the airports primary runway within 10 days. Such work includes but is not limited to the removal and installation of electrical items, temporary pavement marking, and construction surveying. Work outside of the primary runway will be continued once the Runway is open after 10 days. That work will include, but not limited to, sawc
- Status
- Prospective
- Sector
- Airport, Power Generation (CCGT), Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Fort Lauderdale, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Runway 9-27 Pavement Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes, but is not limited to, milling and resurfacing of the airports primary runway within 10 days. Such work includes but is not limited to the removal and installation of electrical items, temporary pavement marking, and construction surveying. Work outside of the primary runway will be continued once the Runway is open after 10 days. That work will include, but not limited to, sawcutting and removing of asphalt, electrical items, milling and paving, paving marking per construc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Fort Lauderdale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Power Generation (CCGT), Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in United States of America
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- AIRPORT ROAD IN VIDALIA - TIA
- ATLANTA-CCO - CRRSA
- DAWSON - CARES ACT
- PROJECT ADMINISTRATION - FAA-3-13-SBGP-04-2009 - FY09 DISCR
- McRAE-ENVIRON. ASSMT. FOR PARALLEL TAXIWAY AREA IMPROVMENT
- REIDSVILLE- FUEL FACILITY CARD READER AND DESIGN OF RUNWAY
