logo

RURAL DEVELOPMENT

Sector: Road • Location: Honduras

Source: World Bank Group

Project
Closed

The Guayape Regional Development Project for Honduras will be the first phase of a Guayape River Watershed scheme for development of the entire Valley. The objective of this first phase is to provide an integrated package of assistance and services for about 1,200 small farmers and 70 agrarian reform settlements with over 1,500 families in selected areas of the Valley. This package will include in

Project Information FAQ

Project Information

5 Q
The project “RURAL DEVELOPMENT” is an infrastructure initiative in the Road sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Guayape Regional Development Project for Honduras will be the first phase of a Guayape River Watershed scheme for development of the entire Valley. The objective of this first phase is to provide an integrated package of assistance and services for about 1,200 small farmers and 70 agrarian reform settlements with over 1,500 families in selected areas of the Valley. This package will include investment and production credit, extension services, machinery pool services, small scale irrigation schemes for some settlements, rural road improvement, and improved research facilities. The project will include technical assistance and training for the project unit and preparation of an agricultural project for possible future Bank lending. The risks associated with the project are possible lack of farmer acceptance of the technological packages, and weak institutional support because of scarcity of qualified personnel and poor coordination between responsible agencies. In order to deal with these potential problems, a modest sized project has been designed with a project unit which will have adequate staff and authority to carry out the project, and the technology to be utilized will be based on the traditional pattern of farming activities in the project area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data