RURAL DEVT WEST HIGH
Sector: Water Supply and Storage • Location: Cameroon
Source: World Bank Group
The nine year Western Highlands Rural Development Project for Cameroon will consist of: (a) strengthening and equipping a newly created directorate of production services, which will be responsible for extension, pest control, seed production, training, and field demonstration and trials; (b) establishing a training center; (c) improving field storage facilities for inputs, coffee, and food crops
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RURAL DEVT WEST HIGH
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The nine year Western Highlands Rural Development Project for Cameroon will consist of: (a) strengthening and equipping a newly created directorate of production services, which will be responsible for extension, pest control, seed production, training, and field demonstration and trials; (b) establishing a training center; (c) improving field storage facilities for inputs, coffee, and food crops by upgrading 25 existing and constructing 10 new rural service centers; (d) establishing a revolving credit fund to finance seasonal inputs and small farm tools and equipment; (e) constructing about 220 water points to provide 18,000 rural families with safer and more convenient water supply; (f) constructing simple water control works to enable about 400 ha of currently uncultivated bottomlands to be put into productive use by some 1,300 rural families; (g) increasing the mechanical coffee grading capacity of UCCAO (Arabica Coffee Growers' Cooperative Union, Western Province) from 7,000 tons to 14,000 tons per year and introducing machines capable of improving coffee quality; (h) establishing a project monitoring unit which will record changes in a limited number of performance indicators as an aid in improving project implementation and monitoring the impact of project actions; and (i) strengthening the planning unit in the ministry of agriculture. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Cameroon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cameroon
- Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
- Cameroon - Lom-Pangar Hydroelectric Project
- Nachtigal hydropower plant
- Kribi Container Terminal
- Cameroon - Agricultural Value Chain Development Project
- CAMWATER
- Douala Container Terminal
- Cameroon - Project to Develop Access Roads to The Industrial and Port Area of Kribi (PARZIK)
