RURAL ELECTRIFICATIO
Sector: Power Generation (CCGT) • Location: Pakistan
Source: World Bank Group
The main objective of this project is to assist GOP in improving rural productivity and the quality of life of the rural population, the subgroup that has benefitted the least from the improvements in the country's economic performance over the past decade. In addition, it would assist in : a) rationalizing investments for rural electrification, b) establishing a long term framework for extending
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RURAL ELECTRIFICATIO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of this project is to assist GOP in improving rural productivity and the quality of life of the rural population, the subgroup that has benefitted the least from the improvements in the country's economic performance over the past decade. In addition, it would assist in : a) rationalizing investments for rural electrification, b) establishing a long term framework for extending the rural network at least cost, c) capturing the benefits of investments already made, while improving the reliability of service and reducing network losses, and d) minimizing the generating capacity shortfalls through the better management of load. The project consists of two components. The first is infrastructure development which includes extending electricity supply to new villages, connecting to grid settlements of already electrified villages, expanding consumer connections, reinforcing the network, and extending the supply to tubewells. The second is technical assitance which would provide for mapping of villages, installing load management schemes and consultancy services. |
Original sector | Energy and Extractives,Public Administration |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Pakistan
- Balloki CombinedCycle Power Project
- Ghazi Barotha RunofRiver Hydroelectric Project
- Karachi nuclear power plant KANUPP expansion
- Engro Thar Block II Power Plant Pakistan
- Bin Qasim Power Station 3 BQPSIII
- Engro Qadirpur NGCC Power Project
- Metro Wind Thatta District Onshore Wind Farm
- Matiari-Lahore Transmission Line
