Rural Infrastructure Development Project in Gallakor
Sector: Water Supply and Storage • Location: Jizzakh, Uzbekistan
Source: Qalampir.uz
The project aims to improve electricity supply in the village of Gallakor, which has faced persistent electricity, gas, and water shortages for a decade. It involves construction and installation work to enhance the power transmission network, funded by the World Bank and the Asian Infrastructure Investment Bank.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Power Transmission, Government
- Location
- Jizzakh, Uzbekistan
- Updated
- 22 Jul 2026
- Source
- Qalampir.uz
ConstructChat
Ask ConstructChat about Rural Infrastructure Development Project in Gallakor
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to improve electricity supply in the village of Gallakor, which has faced persistent electricity, gas, and water shortages for a decade. It involves construction and installation work to enhance the power transmission network, funded by the World Bank and the Asian Infrastructure Investment Bank. |
Original sector | Electricity |
Location
Country | Uzbekistan |
State | Jizzakh |
Source
Source | Qalampir.uz |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2025-02-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
