Rural Municipality of Brokenshell No. 68 - Trossachs Landfill - Landfill Decommissioning
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The main objective of the project is to decommission a former landfill approximately 0.5 ha in size. The project is to construct a engineered cap on the landfill to limit infiltration of surface water and generation of leachate. This will naturally attenuate soil and groundwater impacts currently present at the site thus remediating soil conditions. Ongoing monitoring is planned to ensure that sit
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rural Municipality of Brokenshell No. 68 - Trossachs Landfill - Landfill Decommissioning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the project is to decommission a former landfill approximately 0.5 ha in size. The project is to construct a engineered cap on the landfill to limit infiltration of surface water and generation of leachate. This will naturally attenuate soil and groundwater impacts currently present at the site thus remediating soil conditions. Ongoing monitoring is planned to ensure that site conditions improve with time. Following completion, the site will be used as secure storage for the Rural Municipality with native pasture surfacing. |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
