Rural Municipality of Keys No. 303, Main Haul Bridge Replacement
Sector: Steel • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The Haul Road Bridge Project’s purpose is to replace the existing 12 meter long bridge with a series of new steel culverts. The scope of the project will include the dismantling and disposal of the existing structure, the installation of new steel culverts. Depending on the engineer’s recommendations, and based on the 1:50 year Instantaneous Peak Flow of 28.4 cubic meters per second, there should
- Status
- Closed
- Sector
- Steel, Road, Bridge, Government, Metal
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rural Municipality of Keys No. 303, Main Haul Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Haul Road Bridge Project’s purpose is to replace the existing 12 meter long bridge with a series of new steel culverts. The scope of the project will include the dismantling and disposal of the existing structure, the installation of new steel culverts. Depending on the engineer’s recommendations, and based on the 1:50 year Instantaneous Peak Flow of 28.4 cubic meters per second, there should be either two 2.6 meter culverts, or three 2.2 meter culverts installed. The project is located over the Stony Creek and is located on the existing road north of NW 12-33-03-W2 in the Rural Municipality of Keys No 303. The project is located on an existing road alignment which is owned, maintained and controlled by the Municipality. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Steel, Road, Bridge, Government, Metal |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
